Mr. Jackson
@mrjackson
Skip to content

Solano Transportation Authority Office Building

Solano Transportation Authority Office Building

Project Details

Location: Suisun City, CA

Square Feet: 23,248

Delivery: Design-Build

Categories: Municipal & Civic, Current Projects

Project Description

This project is a new 3-story office building for the Solano Transportation Authority. The tenant uses include office space, assembly, and storage. The office use includes open office, workstations, private offices, employee breakroom, restrooms, storage rooms, and conference rooms. The assembly space is provided by a large conference room, which will serve the public along with the lobby. Site work includes new flat work, landscaping, and irrigation.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Oak Park Community Center

Oak Park Community Center

Project Details

Location: N/A

Square Feet: N/A

Delivery: N/A

Categories: Sustainable Projects, Corporate Complexes

Project Description

This addition to the community center features a 10,500 square-foot steel-framed gymnasium, along with a multi-purpose building. This project received LEED Gold Certification.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

City Of Sacramento City Hall Parking Garage Revitalization

City Of Sacramento City Hall Parking Garage Revitalization

Project Details

Location: Sacramento, CA

Square Feet: N/A

Delivery: Design/Build

Categories: Parking Structures

Project Description

Otto, together with the architect, presented to the campus design and construction costs that were $1.5 million under budget. With these savings, CSU Chico was able to add additional scope and facility enhancements. The building achieved LEED Gold certification and sustainable features implemented into the design and construction include 10 electric vehicle charging stations, high efficiency lighting, rooftop solar panels, recycled and regional construction materials, low-emitting VOC paints and coatings, and storm water treatment using a bio-filtration system.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

CSU Chico Normal Avenue Parking Structure & EHC/UPD Building

CSU Chico Normal Avenue Parking Structure & EHC/UPD Building

Project Details

Location: Chico, CA

Square Feet: 106,464

Delivery: Design/Build

Categories: Education, Parking Structures

Project Description

Otto, together with the architect, presented to the campus design and construction costs that were $1.5 million under budget. With these savings, CSU Chico was able to add additional scope and facility enhancements. The building achieved LEED Gold certification and sustainable features implemented into the design and construction include 10 electric vehicle charging stations, high efficiency lighting, rooftop solar panels, recycled and regional construction materials, low-emitting VOC paints and coatings, and storm water treatment using a bio-filtration system.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Cosumnes River College Parking Structure

Cosumnes River College Parking Structure

Project Details

Location: Sacramento, CA

Square Feet: 596,450

Delivery: Lease/Leaseback

Categories: Education, Parking Structures

Project Description

This 2,016 space, five-level parking structure serves both students of CRC and Regional Transit Light Rail passengers of the Blue Line. Design elements include three circulation towers at the corners of the structure, and a monumental stair from the northwest corner of the structure to the main entrance of the campus.  In order to ensure student safety, the interior of the structure was painted all white with bright lighting, security cameras throughout, emergency telephones, and a clear line of sight across every level. Sustainable features include 20 EV charging stations, motion sensor lighting, and a rooftop array of solar panels. Other unique characteristics of the structure include an electronic sign system that shows available parking spaces on each level, charging stations for electric vehicles and two electronic marquees placed on the east-side towers that will inform the community of campus activities.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Eskaton Village Roseville

Eskaton Village Roseville

Project Details

Location: Roseville, CA

Square Feet: 81,000

Delivery: Design-Build

Categories: Senior Living

Project Description

Eskaton Properties has been one of Otto Construction’s most longstanding clients. This positive relationship has created opportunities for Otto to expand into the development of senior housing facilities throughout Northern California. In Roseville, this two-story wood-framed facility consists of 72 assisted living units and 24 memory care units. In addition to services provided such as meals, laundry, housekeeping, transportation and recreational, social and educational programs, the facility is also equipped with a piano lounge, multi-purpose room, gift shop and beauty shop.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Atterdag Village Of Solvang

Atterdag Village Of Solvang

Project Details

Location: Solvang, CA

Square Feet: 20,000

Delivery: Design-Assist

Categories: Senior Living Complexes

Project Description

Otto Construction completed work on this existing assisted living community, building upon 1.8 acres of undeveloped land and remodeling portions of the existing campus. The scope of work includes construction of nine independent living cottages and a new 20,000 SF assisted living building, which includes 14 residential apartments, community areas, fitness center, activity rooms, a dining area, beauty salon, and administration offices.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Hospice Of Humboldt

Hospice Of Humboldt

Project Details

Location: Eureka, CA

Square Feet: 33,430

Delivery: Negotiated/IPD

Categories: Healthcare, Senior Living

Project Description

Otto Construction provided preconstruction and construction services for Hospice of Humboldt’s new campus. Otto worked with project architect and the Hospice of Humboldt team to design and build this wonderful campus in a pristine setting. The project site consisted of 13.5 acres of timbered and riparian areas adjacent to residential neighborhoods and medical offices. The new Hospice Campus includes a twostory administration building of approximately 18,000SF, and inpatient hospice facility of approximately 14,500SF, a chapel of approximately 930SF, and small maintenance building of approximately 450SF. The buildings are surrounded by 146 parking spaces and walking paths and trails.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Natomas Office Building

Natomas Office Building

Project Details

Location: Natomas, CA

Square Feet: 60,000

Delivery: Design • Assist

Categories: Corporate Complexes

Project Description

Construction of a three-story structural steel-frame, warm shell office building with concrete tilt-up exterior.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

CA State Lottery Headquarters

CA State Lottery Headquarters

Project Details

Location: Sacramento, CA

Square Feet: 155,000

Delivery: Integrated Project Delivery (IPD)

Categories: Sustainable Projects, Corporate Complexes

Project Description

The CA Lottery building was designed to promote a number of construction and design practices to increase profitability while reducing negative environmental impacts. Completed in July 2011, the project achieved LEED Gold Certification by the USGBC through a number of sustainable features. These include: Vegetated Roof System which accounts for water conservation, solar heat gain and reduction in urban heat islands; Photovoltaics – generating electric power by using solar cells to convert energy from the sun into electricity; Ice Storage – through this method, we reduced cooling costs between 30-40%, while reducing peak demands on utilities; Automatic Window Coverings – they adjust to sun and heat; Materials and Resources – during construction we achieved a high recycled content in construction materials.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.