Oak Ridge Elementary School

Oak Ridge Elementary School

Project Details

Location: Sacramento, CA

Square Feet: 53,300

Delivery: Lease-Leaseback

Categories: Current Projects, Education

The construction of the new Oak Ridge Elementary School serves as a testament to the Sacramento City Unified School District’s commitment to build equity in historically marginalized and underserved neighborhoods. The new 53,300SF school will be constructed on the current play fields, and consist of a two-story classroom building, kindergarten and preschool building, library, exploration lab, multi-purpose room, student services, and a community engagement center. Once the new campus has been built, the existing campus will be demolished to make room for play fields and hard courts.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Stanislaus State Acacia Hall

Stanislaus State Acacia Hall

Project Details

Location: Stockton, CA

Square Feet: 48,000

Delivery: Collaborative Design-Build

Categories: Current Projects

The building spans 48,000 SF and includes classrooms, testing and tutoring rooms, offices, and lounge and student engagement spaces. It features a 4,800 SF multipurpose venue and an outdoor courtyard that includes 1,600 SF of covered outdoor gathering space.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Fairytale Town Administration Building

Fairytale Town Administration Building

Project Details

Location: Sacramento, CA

Square Feet: 2,956

Delivery: Design-Assist

Categories: Current Projects

The new 2,956 SF administration building at Fairytale Town will include accessible box offices, administration offices, and accessible gender-neutral restrooms.  

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Sacramento State Art Sculpture Lab

Sacramento State Art Sculpture Lab

Project Details

Location: Sacramento, CA

Square Feet: 20,377

Delivery: CM-at-Risk

Categories: Education, Current Projects

The new Art Sculpture Lab at Sacramento State replaces a warehouse currently housing the department since the 1960’s. The 20,377SF building will provide appropriate and safe instructional and graduate studio spaces for drawing, painting, sculpture, metal fabrication, and woodworking, including a secure working courtyard and a public sculpture yard.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

American River College Natomas Center Phases II & III

American River College Natomas Center Phases II & III

Project Details

Location: Sacramento, CA

Square Feet: 49,800

Delivery: Design-Bid-Build

Categories: Education, Current Projects

The building program is formed around a central courtyard into which the buildings view and access. This final phase of development complements the original program and includes 5 science labs and associated prep space, 6 classrooms, 4 computer labs, a multi-purpose art lab, faculty offices, administration space and collaboration spaces of different scales both inside and outside the building.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Folsom Lake College Science Building

Folsom Lake College Science Building

Project Details

Location: Folsom, CA

Square Feet: 75,000

Delivery: Design-Bid-Build

Categories: Education, Current Projects

The new 2-story 75,000SF science building is Los Rios Community College District’s single largest value project ever constructed. The instructional building will house six Biology labs, six Chemistry labs, and a 4,000 sq. ft. Science Center, allowing Folsom Lake College (FLC) to significantly expand its science program. Located near the main entrance of FLC, it will establish a dramatic and beautiful presence. Building on the occupied campus will require close coordination to ensure student and staff safety, and to limit disruptions to existing operations.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.