SMF Terminal B Parking Garage

SMF Terminal B Parking Garage

Project Details

Location: Sacramento, CA

Size: 6 levels, 5,512 spaces

Delivery: Design-Build

Categories: Current Projects, Parking Structures

The Sacramento International Airport Terminal B Parking Garage will be a six-level, 5,512-space facility located west of Terminal B, seamlessly connected to the Terminal via an existing five-story elevator tower and pedestrian bridge. This impressive structure is designed with a long-span, cast-in-place concrete system featuring post-tensioned slabs and beams, along with a slab-on-grade base. A lateral load-resisting system, achieved through moment-resisting frames in both longitudinal and transverse directions, was selected to create a visually open design that enhances security and wayfinding.

The garage’s functional layout includes dual helix vertical circulation points at the southern corners, ensuring efficient traffic flow. Each level features major north-south drive aisles on the east and west sides with two-way traffic, while one-way aisles running east-west serve angled parking spaces. Traffic circulation is managed through entry and exit helixes across all levels.

The polygon-shaped structure spans approximately 453 feet in width and 868 feet in length, covering a total area of 1,945,571 gross square feet. With design efficiency of 340 square feet per stall, it accommodates 5,512 parking spaces. This development aims to improve the traveler experience by expanding parking capacity and incorporating modern amenities, reflecting the airport’s commitment to meeting current and future passenger needs.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Stanislaus State Stockton Campus Academic Building

Stanislaus State Stockton Campus Academic Building

Project Details

Location: Stockton, CA

Square Feet: 48,000

Delivery: Collaborative Design-Build

Categories: Education, Current Projects

The new academic building will be the first new building on the Stanislaus State Stockton Campus at University Park. It spans 48,000 SF and includes classrooms, testing and tutoring rooms, offices, and lounge and student engagement spaces. It features a 4,800 SF multipurpose venue and an outdoor courtyard that includes 1,600 SF of covered outdoor gathering space. The building incorporates natural light into the academic and gathering spaces and a state-of-the-art heating and cooling system throughout.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Dennis & Janice Caprara Community Center Complex

Dennis & Janice Caprara Community Center Complex

Project Details

Location: Gonzales, CA

Square Feet: 18,900

Delivery: Design-Build

Categories: Current Projects, In Your Community

The Dennis & Janice Caprara Community Center Complex will provide space dedicated to a public library, community hall, fitness center, commercial kitchen, and teen innovation lab and lounge. This program will be divided in to two “C” shaped buildings – building “A”, approximately 10,000SF and building “B”, approximately 8,900SF. The two buildings will form a courtyard that features an amphitheater, play/discovery area, seating, and outdoor classrooms. The buildings are both single-story and are sited to nestle into the neighborhood context with large, glazed corners that amplify the connection to the community. The community center is supported by 90 vehicular parking spaces and 15 short term bike racks.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

N. Salinas High School Classroom Building

N. Salinas High School Classroom Building

Project Details

Location: Salinas, CA

Square Feet: 26,880

Delivery: Lease-Leaseback

Categories: Current Projects, Education

The construction of this new classroom and administration building is the largest investment in North Salinas High School since its original construction in 1959. The two-story building will contain 18 classrooms, including sports medicine, new student plaza, and administration offices. The expanded parking lot and drop off lanes will create a new main entrance for the campus. 

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

McKinley Park Renovation

McKinley Park Renovation

Project Details

Location: Stockton, CA

Square Feet: 22.3 acres

Delivery: Design-Bid-Build

Categories: Current Projects, In Your Community

The McKinley Park Renovation project will reinvigorate this neglected neighborhood amenity and create a renewed sense of community among local residents. Once completed, McKinley Park will include a renovated swimming pool and pool house; new picnic shelters, ball fields, kids play area, restroom building, basketball courts, futsal courts, and soccer fields; new trees, landscaping and updated irrigation; as well as path lighting, and updated parking. 

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.