Mr. Jackson
@mrjackson
Skip to content

Solano Transportation Authority Office Building

Solano Transportation Authority Office Building

Project Details

Location: Suisun City, CA

Square Feet: 23,248

Delivery: Design-Build

Categories: Municipal & Civic, Current Projects

Project Description

This project is a new 3-story office building for the Solano Transportation Authority. The tenant uses include office space, assembly, and storage. The office use includes open office, workstations, private offices, employee breakroom, restrooms, storage rooms, and conference rooms. The assembly space is provided by a large conference room, which will serve the public along with the lobby. Site work includes new flat work, landscaping, and irrigation.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Natomas Office Building

Natomas Office Building

Project Details

Location: Natomas, CA

Square Feet: 60,000

Delivery: Design • Assist

Categories: Corporate Complexes

Project Description

Construction of a three-story structural steel-frame, warm shell office building with concrete tilt-up exterior.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

CA State Lottery Headquarters

CA State Lottery Headquarters

Project Details

Location: Sacramento, CA

Square Feet: 155,000

Delivery: Integrated Project Delivery (IPD)

Categories: Sustainable Projects, Corporate Complexes

Project Description

The CA Lottery building was designed to promote a number of construction and design practices to increase profitability while reducing negative environmental impacts. Completed in July 2011, the project achieved LEED Gold Certification by the USGBC through a number of sustainable features. These include: Vegetated Roof System which accounts for water conservation, solar heat gain and reduction in urban heat islands; Photovoltaics – generating electric power by using solar cells to convert energy from the sun into electricity; Ice Storage – through this method, we reduced cooling costs between 30-40%, while reducing peak demands on utilities; Automatic Window Coverings – they adjust to sun and heat; Materials and Resources – during construction we achieved a high recycled content in construction materials.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Turlock Irrigation District Palm Street Office Complex Renovation

Turlock Irrigation District Palm Street Office Complex Renovation

Project Details

Location: Turlock, CA

Square Feet: 37,018

Delivery: CM-at-Risk

Categories: Renovations, Corporate Complexes

Project Description

This project consisted of the renovation of two existing buildings that were previously occupied by the City of Turlock into a new Power Operations Building and Water Distribution Building for the Turlock Irrigation District. The two buildings required significant renovations, including replacing and raising the roof structure to provide clear span spaces and additional height on the inside for the Power Control Center’s video display wall. The new open office environment is surrounded by support spaces such as focus rooms, a new Irrigation Control room, fitness center, break and locker rooms, and new conference rooms. Both buildings were designed to optimize energy efficiency, conserve resources, and reduce long-term maintenance costs for the District.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.