Mr. Jackson
@mrjackson
Skip to content

Pamela Mari Tech Hub

DaVinci Tech Hub Exterior

Pamela Mari Tech Hub

Project Details

Location: Davis, CA

Square Feet: 13,000

Delivery: Lease-Leaseback

Categories: Education

Delivered via Lease-Leaseback, the new 13,000SF facility is home to Da Vinci Charter High School’s Computer Science Program. The building’s learning spaces consist of a tech hub, computer lab, science lab, makerspace, CTE breakout space, and digital fabrication and media production spaces. The building also houses the P.E. office, boys and girls locker rooms and restrooms, storage rooms, and utility rooms.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Florin High School Agriculture, Culinary, and Engineering CTE

Florin High School Agriculture, Culinary, and Engineering CTE

Project Details

Location: Sacramento, CA

Square Feet: 17,100

Delivery: Design-Bid-Build

Categories: Education

The new 8,000SF Culinary Center will house two kitchen studios, a demonstration classroom, food storage and staff offices. Adjacent to the Culinary Center will be the Agricultural Center for Experiential Learning consisting of a 4,000SF pre-engineered steel animal barn providing new pen and show space for livestock and include a hatchery and nursery care for poultry. A new modular classroom building containing two labs will provide additional hands-on learning space.

The new CTE Engineering Center will consist of the modernization of 1,400SF of an existing building to serve as a computer design studio and construction of a new 3,700SF addition to house an advanced fabrication lab. The lab will contain Computer Numerical Control (CNC) milling machines capable of creating parts for student-built robots, rockets and remote-controlled vehicles. The associated site work includes the relocation of existing portable classroom buildings and tennis courts.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Mortensen Field

Mortensen Field

Project Details

Location: Salinas, CA

Square Feet: N/A

Delivery: Lease-Leaseback

Categories: Education

This project consists of the renovation of an existing stadium at Rancho San Juan High School. The scope of work consists of new 1,500-seat grandstands, a 2,000SF restroom/concession building, new field and pathway lighting, new all-weather track, security fencing, varsity baseball backstop extension, and a 300 sq.ft. greenhouse.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Greer Elementary School Modernization

Greer Elementary School Modernization

Project Details

Location: Sacramento, CA

Square Feet: 56,815

Delivery: Design-Build

Categories: Education

This innovative Design-Build project provided over 30,000 SF of new ground-up facilities and 24,000 SF of heavy modernization to create an entirely new campus on the original site dating back to the 1960’s. Greer Elementary School builds upon a custom modular classroom design developed by the architect and built by Otto. This was done to help meet a strictly phased construction schedule and to maintain full operations of the campus of over 500 students during construction. The project provides 21st century collaborative learning environments for its K-5 students, including outdoor workspaces and interior break-out spaces. Rooms are flexible and roll-up garage doors connect some classrooms to adjacent outdoor learning spaces.

This project rotated the school 90 degrees on its site and features three new buildings housing 16 classrooms, an administration building, and multi-purpose room twice the size of the original one. Two existing buildings containing 12 classrooms were remodeled to complement the new construction.

The school remained occupied throughout construction, requiring the project to be broken up into five phases and the students to be housed in temporary classrooms that remained on site for the duration of the project. As buildings were complete, students were moved into the newly constructed classrooms and students from existing classrooms were moved to the temporary classrooms, and so forth.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Rancho Santana School

Rancho Santana School

Project Details

Location: Hollister, CA

Square Feet: 75,000

Delivery: Design-Build

Categories: Education

Rancho Santana School serves the Santana Ranch housing development and provides 21st century learning to approximately 850 TK-8th grade students. Built on a 12 acre site, the new two-story school consists of an administration building, library/media center, thirty-five classrooms, a playground, ball courts, and turf fields. Initially, three classrooms will be used as a warming kitchen and multi-purpose room until a permanent cafeteria is built in a later phase. The site is separated into three tiers. The buildings sit prominently on the first tier, the play courts are on the second, and the sports fields are on the lower tier.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

CRC College Center Expansion

CRC College Center Expansion

Project Details

Location: Sacramento, CA

Square Feet: 30,560

Delivery: Design-Bid-Build

Categories: Education

The new 30,560SF, two-story addition to the existing college center brings together services that were previously spread out across campus, making it easier for new and returning students to receive assistance before the start of each semester. The first floor houses Admissions and Records, the Student Access Center, and Counseling and Assessment. The second floor consists of the Transfer Center, Extended Opportunity Program and Services, and the president’s office. The main lobby is designed as a social hub with stadium-style seating and charging stations for students to connect their electronics while they study, hang out, or just relax. The scope also includes modernization to the existing building and site upgrades.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Greenfield High School Classroom Building

Greenfield High School Classroom Building

Project Details

Location: Greenfield, CA

Square Feet: 24,417

Delivery: Lease-Leaseback

Categories: Education

This project was divided in two increments. Increment I consisted of site work including a new access road, parking lot, gateway into the school campus, fencing, landscaping, and ADA improvements. All site preparation for the building was performed in Increment I including rough grading, pouring the building pad, installing utilities up to 5′ from the building footprint, and underground site electrical. Increment II was the construction of a new 24,417SF, 2-story modular classroom building containing 14 general classrooms and four S.T.E.M. classrooms. The new building sits at the campus entrance.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

CRC Elk Grove Center Phase II

CRC Elk Grove Center Rendering

CRC Elk Grove Center Phase II

Project Details

Location: Elk Grove, CA

Square Feet: 25,000

Delivery: Design-Bid-Build

Categories: Education, Current Projects

This project consists of the construction of a new 2-story, 25,000SF academic building at the Cosumnes River College Elk Grove Center.  The building will be constructed using type IIB construction and will house A and B occupancies. Associated landscaping, utilities, and civil work is included in the scope of work. The building is a slab-on-grade, with structural steel, metal framing and curtain wall system, interior has instructional biology, chemistry, and anatomy laboratories as well as much needed support and interaction spaces.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Stanislaus State Vasche Library Renovation

Stanislaus State Vasche Library Renovation

Project Details

Location: Turlock, CA

Square Feet: 133,077

Delivery: Collaborative Design-Build

Categories: Education, Renovations

Project Description

This Collaborative Design-Build partnership between Otto Construction, EHDD Architects and CSU Stanislaus brought the 3-story 1960s era building into the 21st century. Now fully renovated, the 133,077SF library can accommodate 1,000 people at a time and house Stan State’s collection of over 675,000 items thanks to a new state-of-the-art Electronic Compact Book Storage System. Previously, the same collection took up over 30,000SF of space on multiple floors, but now only requires 16,977SF. This feature left more space in the renovated library for new amenities. Extensive technology resources, including distributed computers, laptop check out, tech help desk, and multimedia group study rooms, give students a wide variety of spaces and technologies to meet their needs. Additional amenities include 24-hour study areas, a café, group study spaces and quiet zones with a variety of seating options. New openings in the second floor allow daylight to filter down to the first floor from new clerestory windows. 

The first phase of the project consisted of the installation of 32 trailers to serve as a temporary home for library services. This made room for the library to be vacated before construction began.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

CSU Monterey Bay College of Arts, Humanities & Social Sciences

CSU Monterey Bay College of Arts, Humanities & Social Sciences

Project Details

Location: Seaside, CA

Square Feet: 49,000

Delivery: Collaborative Design-Build

Categories: Education, Sustainable Projects

Project Description

Delivered via Collaborative Design-Build, the new 49,000SF building brings together the College of Arts, Humanities and Social Sciences. The main floor consists of lecture and classroom spaces, gallery space, a 200-seat screening room, and Dean’s Suite. The second floor contains faculty offices, instructional spaces, support spaces, and gathering spaces that create collaboration zones. The building’s u-shaped configuration wraps around a central amphitheater-style courtyard that will act as a mixed-use gathering space. The building’s main entrance is adorned with CSUMB Professor Emerita Johanna Poethig’s 12’x45′ mural, Skylight: Transmission of Knowledge/Windows to Justice.

This project was certified LEED Platinum

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.