Rancho Santana School

Rancho Santana School

Project Details

Location: Hollister, CA

Square Feet: 75,000

Delivery: Design-Build

Categories: Education

Rancho Santana School serves the Santana Ranch housing development and provides 21st century learning to approximately 850 TK-8th grade students. Built on a 12 acre site, the new two-story school consists of an administration building, library/media center, thirty-five classrooms, a playground, ball courts, and turf fields. Initially, three classrooms will be used as a warming kitchen and multi-purpose room until a permanent cafeteria is built in a later phase. The site is separated into three tiers. The buildings sit prominently on the first tier, the play courts are on the second, and the sports fields are on the lower tier.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

CRC College Center Expansion

CRC College Center Expansion

Project Details

Location: Sacramento, CA

Square Feet: 30,560

Delivery: Design-Bid-Build

Categories: Education

The new 30,560SF, two-story addition to the existing college center brings together services that were previously spread out across campus, making it easier for new and returning students to receive assistance before the start of each semester. The first floor houses Admissions and Records, the Student Access Center, and Counseling and Assessment. The second floor consists of the Transfer Center, Extended Opportunity Program and Services, and the president’s office. The main lobby is designed as a social hub with stadium-style seating and charging stations for students to connect their electronics while they study, hang out, or just relax. The scope also includes modernization to the existing building and site upgrades.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Greenfield High School Classroom Building

Greenfield High School Classroom Building

Project Details

Location: Greenfield, CA

Square Feet: 24,417

Delivery: Lease-Leaseback

Categories: Education

This project was divided in two increments. Increment I consisted of site work including a new access road, parking lot, gateway into the school campus, fencing, landscaping, and ADA improvements. All site preparation for the building was performed in Increment I including rough grading, pouring the building pad, installing utilities up to 5′ from the building footprint, and underground site electrical. Increment II was the construction of a new 24,417SF, 2-story modular classroom building containing 14 general classrooms and four S.T.E.M. classrooms. The new building sits at the campus entrance.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

CRC Elk Grove Center Phase II

CRC Elk Grove Center Rendering

CRC Elk Grove Center Phase II

Project Details

Location: Elk Grove, CA

Square Feet: 25,000

Delivery: Design-Bid-Build

Categories: Education, Current Projects

This project consists of the construction of a new 2-story, 25,000SF academic building at the Cosumnes River College Elk Grove Center.  The building will be constructed using type IIB construction and will house A and B occupancies. Associated landscaping, utilities, and civil work is included in the scope of work. The building is a slab-on-grade, with structural steel, metal framing and curtain wall system, interior has instructional biology, chemistry, and anatomy laboratories as well as much needed support and interaction spaces.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

SMUD Museum Of Science And Curiosity

SMUD Museum Of Science And Curiosity

Project Details

Location: Sacramento, CA

Square Feet: 48,940

Delivery: Design-Build

Categories: Renovations, In Your Community

The SMUD Museum of Science and Curiosity – formerly known as the Powerhouse Science Center – is an adaptive reuse of the historic 1912-era PG&E Power Station, which sat vacant on the banks of the Sacramento River for 60 years. Before becoming the region’s newest hub for science education and exploration, the historic structure had to undergo stabilization and  rehabilitation. The building received a complete structural retrofit and a second floor for flexible exhibit space. A new two-story, 22,000SF addition was built on the east side of the existing building and contains an entry lobby, classrooms, offices, a café and a 110-seat planetarium prominently on display with a zinc-clad hemispheric dome rising above the building’s mass.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Stanislaus State Vasche Library Renovation

Stanislaus State Vasche Library Renovation

Project Details

Location: Turlock, CA

Square Feet: 133,077

Delivery: Collaborative Design-Build

Categories: Education, Renovations

Project Description

This Collaborative Design-Build partnership between Otto Construction, EHDD Architects and CSU Stanislaus brought the 3-story 1960s era building into the 21st century. Now fully renovated, the 133,077SF library can accommodate 1,000 people at a time and house Stan State’s collection of over 675,000 items thanks to a new state-of-the-art Electronic Compact Book Storage System. Previously, the same collection took up over 30,000SF of space on multiple floors, but now only requires 16,977SF. This feature left more space in the renovated library for new amenities. Extensive technology resources, including distributed computers, laptop check out, tech help desk, and multimedia group study rooms, give students a wide variety of spaces and technologies to meet their needs. Additional amenities include 24-hour study areas, a café, group study spaces and quiet zones with a variety of seating options. New openings in the second floor allow daylight to filter down to the first floor from new clerestory windows. 

The first phase of the project consisted of the installation of 32 trailers to serve as a temporary home for library services. This made room for the library to be vacated before construction began.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

CSU Monterey Bay College of Arts, Humanities & Social Sciences

CSU Monterey Bay College of Arts, Humanities & Social Sciences

Project Details

Location: Seaside, CA

Square Feet: 49,000

Delivery: Collaborative Design-Build

Categories: Education, Sustainable Projects

Project Description

Delivered via Collaborative Design-Build, the new 49,000SF building brings together the College of Arts, Humanities and Social Sciences. The main floor consists of lecture and classroom spaces, gallery space, a 200-seat screening room, and Dean’s Suite. The second floor contains faculty offices, instructional spaces, support spaces, and gathering spaces that create collaboration zones. The building’s u-shaped configuration wraps around a central amphitheater-style courtyard that will act as a mixed-use gathering space. The building’s main entrance is adorned with CSUMB Professor Emerita Johanna Poethig’s 12’x45′ mural, Skylight: Transmission of Knowledge/Windows to Justice.

This project was certified LEED Platinum

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Capitola Library

Capitola Library

Project Details

Location: Capitola, CA

Square Feet: 11,700

Delivery: Design-Bid-Build

Categories: In Your Community

Project Description

This project consists of the demolition of the existing library and construction of a new 11,700SF library. The new building is flexible and modern, incorporating quiet outdoor reading spaces and better connections to its surroundings with features such as a pedestrian walkway to the nearby creek. With a serene, light-filled reading room, a vibrant children’s area, a community porch and meeting room, the new library is designed to bring people together and nurture engagement.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

North Natomas Community Center and Aquatics Complex

North Natomas Community Center and Aquatics Complex

Project Details

Location: Sacramento, CA

Square Feet: 23,538

Delivery: Design-Assist

Categories: In Your Community, Current Projects

Project Description

This project consists of a 50-meter competition pool, shaded bleachers, a 25-meter pool, an activity pool with a kid’s play area, and two water slides. The administration building contains showers, lockers, concessions, and staff offices. There is also an 8,400SF community center with patio seating and a fire pit that can be rented out by the public for private events.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Hamilton, Ellis & Martin Plaza Renovation

Hamilton, Ellis & Martin Plaza Renovation

Project Details

Location: Seaside, CA

Square Feet: 150,723

Delivery: Negotiated

Categories: Housing, Renovations

Project Description

The project consisted of renovating all apartment units, common buildings, and parking lots. With 192 units, our team used a “rotational process” to avoid displacing any of the residents. This means residents took turns moving to empty units while their apartments were renovated. The renovations included new doors and windows, flooring, light fixtures, appliances, casework, paint, roofing, siding, and balcony enclosures. Amenity improvements included a renovated community center, administration office, laundry facility, a new basketball half-court, outdoor gathering areas and furnishings, and community garden. Accessibility improvements included widening doorways and installing handrails, ramps, signage, and auto-operated doors.