Carmel Valley Manor Pavilion Renovation

Carmel Valley Manor Pavilion Renovation

Project Details

Location: Carmel, CA

Square Feet: 22,974

Delivery: Design-Assist

Categories: Senior Living Complexes, Renovations, Current Projects

Renovation of the 22,974SF Carmel Valley Manor Pavilion including a new bistro, dining room, lounge, reception, and courtyard.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Fairytale Town Story Center

Fairytale Town Story Center

Project Details

Location: Sacramento, CA

Square Feet: 2,782

Delivery: Design-Assist

Categories: In Your Community

The 2,782SF Fairytale Town Story Center consists of a children’s indoor play activity/exhibit area, community room, staff meeting room and storage. Children will be able to write, act out, and produce their own story in this inspiring, indoor space and outdoor amphitheater. Otto Construction built Fairytale Town over 60 years ago and to return and contribute to its expansion with the construction of the new Story Center has been a rewarding experience!

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

SMF Terminal A Restroom Renovations

Restroom Interior

SMF Terminal A Restroom Renovations

Project Details

Location: Sacramento, CA

Square Feet: 9,696

Delivery: CM-at-Risk

Categories: Municipal & Civic, Renovations

This project consists of the renovation of 8 restroom groupings the Sacramento International Airport’s Terminal A. To maintain daily operations and provide enough restrooms open to serve travelers, the work will be performed in 3 phases. The existing restrooms will be demolished and built with new configurations, including fully enclosed toilet rooms for increased privacy.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Luther Burbank H.S. Pool Replacement

Luther Burbank H.S. Pool Replacement

Project Details

Location: Sacramento, CA

Square Feet: N/A

Delivery: Lease-Leaseback

Categories: Education, Renovations

This project consisted of the complete removal and replacement of a 6-lane x 25-yard swimming pool, mechanical/chemical systems, and drainage system. The pool deck had to be raised six inches to be level with adjacent walkways, locker rooms, etc.  This increased the amount of usable pool deck area for the addition of bleachers and made the deck ADA compliant. The lockers and showers were replaced in both the girl’s and boy’s locker rooms, and elevations changed to meet current ADA compliance requirements.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Marzen Building Renovation

Marzen Building Renovation

Project Details

Location: Sacramento, CA

Square Feet: 3,500

Delivery: Design-Assist

Categories: Renovations, In Your Community

The historic 2-story, 3,500SF 1930’s Marzen Building is located on the Sacramento Children’s Home campus. Since 1867, the Sacramento Children’s Home has been committed to helping children by providing high-quality care to the Sacramento region’s most vulnerable children and families.

The main focus of the renovation centered around retaining the external envelope, material, and details (brick and wood-framed windows) as well as the majority of interior partition walls, and historic wood staircase. The goal was for a more modern and up-to-date building with private offices and meeting spaces. Upgrades were necessary to address accessibility, acoustics, plumbing, mechanical, and electrical systems of the building. Abatement of lead paint and ceramic tiles, and asbestos linoleum was required.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

KIPP University Park

KIPP University Park

Project Details

Location: Stockton, CA

Square Feet: 46,000

Delivery: Design-Assist

Categories: Education

KIPP University Park was divided into three phases. Otto recently completed Phase I, which consisted of site utilities, a parking lot and installation of 6 portable buildings containing classrooms and offices, and 1 portable restroom building totaling 6,000SF, and an outdoor play space. These temporary facilities are serving100 middle school students. Phase II consists of the construction of a new 2-story 30,604SF classroom building containing 21 classrooms and offices, 9,272SF gym/administration building including a servery and restrooms, 2 playgrounds and recreational space. This will serve 585 TK-4 students and is currently under construction.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.