Folsom Lake College Science Building

Folsom Lake College Science Building

Project Details

Location: Folsom, CA

Square Feet: 75,000

Delivery: Design-Bid-Build

Categories: Education, Current Projects

The new 2-story 75,000SF science building is Los Rios Community College District’s single largest value project ever constructed. The instructional building will house six Biology labs, six Chemistry labs, and a 4,000 sq. ft. Science Center, allowing Folsom Lake College (FLC) to significantly expand its science program. Located near the main entrance of FLC, it will establish a dramatic and beautiful presence. Building on the occupied campus will require close coordination to ensure student and staff safety, and to limit disruptions to existing operations.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

ARC Technical Education Building

ARC Technical Education Building

Project Details

Location: Sacramento, CA

Square Feet: 91,000

Delivery: Design-Bid-Build

Categories: Education, Current Projects

This project consists of the construction of a new 2-story, 91,000SF Technical Education Building for the Los Rios Community College District American River College campus. The new building will consist of classrooms, staff offices, conference rooms, gathering spaces, laboratories and maker spaces. Laboratories include an electronics lab, computer lab, soldering lab, mechanical/plumbing lab, and welding yard. There will also be an auto shop and auto yard.

The scope of work requires the demolition of 5 existing building and the associated canopy structures and site work, but the automotive technology building will remain until the new building is complete. This will require our team to provide students an accessible path of travel around the construction site to access the building, which will be just 30 feet from the construction site. Once the new facility has been completed, the auto technology building will be demolished and the automotive yard and welding yard will be built. A new parking lot and associated landscape will take place of the existing automotive technology building.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Sacramento State Faculty & Staff Housing

Sacramento State Faculty & Staff Housing

Project Details

Location: Sacramento, CA

Square Feet: 28,392

Delivery: Collaborative Design-Build

Categories: Education, Housing, Current Projects

Located at the edge of the campus, the building will be situated in an established residential neighborhood and serve as transitional housing for new faculty. The architecture, massing, scale, and materials were designed within the neighborhood context. The three-story, wood-framed housing building will consist of 30 residential units and is organized to save the existing Oak tree and focal point of the courtyard.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Carme Valley Manor Pavilion Renovation

Carme Valley Manor Pavilion Renovation

Project Details

Location: Carmel, CA

Square Feet: 22,974

Delivery: Design-Assist

Categories: Senior Living Complexes, Renovations, Current Projects

Renovation of the 22,974SF Carmel Valley Manor Pavilion including a new bistro, dining room, lounge, reception, and courtyard.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

SMF Terminal A Restroom Renovations

SMF Terminal A Restroom Renovations

Project Details

Location: Sacramento, CA

Square Feet: 9,696

Delivery: CM-at-Risk

Categories: Municipal & Civic, Renovations, Current Projects

This project consists of the renovation of 8 restroom groupings the Sacramento International Airport’s Terminal A. To maintain daily operations and provide enough restrooms open to serve travelers, the work will be performed in 3 phases. The existing restrooms will be demolished and built with new configurations, including fully enclosed toilet rooms for increased privacy.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Luther Burbank H.S. Pool Replacement

Luther Burbank H.S. Pool Replacement

Project Details

Location: Sacramento, CA

Square Feet: N/A

Delivery: Lease-Leaseback

Categories: Education, Current Projects

This project consisted of the complete removal and replacement of a 6-lane x 25-yard swimming pool, mechanical/chemical systems, and drainage system. The pool deck had to be raised six inches to be level with adjacent walkways, locker rooms, etc.  This increased the amount of usable pool deck area for the addition of bleachers and made the deck ADA compliant. The lockers and showers were replaced in both the girl’s and boy’s locker rooms, and elevations changed to meet current ADA compliance requirements.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

KIPP Conway Homes

KIPP Conway Homes

Project Details

Location: Stockton, CA

Square Feet: 14,335

Delivery: Design-Assist

Categories: Education, Current Projects

 KIPP will operate a public school at Conway Homes – a public housing project located in South Stockton – both to bring a high-quality educational option to Conway Homes families and to help catalyze change for the community.

This project is divided into three phases:

1. Demolition of existing site features, utilities and maintenance buildings.
2. Site work and preparation for the installation of nine 960SF modular classrooms and relocation of two existing modular classrooms.
3. Construction of a new 3,775SF multi-purpose building.

Otto Construction and PBK have been collaborating to finalize the design and provide cost-saving solution. Phase 1 is site work and construction is currently in progress, with phases 2 and 3 still in design.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

KIPP University Park

KIPP University Park

Project Details

Location: Stockton, CA

Square Feet: 46,000

Delivery: Design-Assist

Categories: Education, Current Projects

KIPP University Park was divided into three phases. Otto recently completed Phase I, which consisted of site utilities, a parking lot and installation of 6 portable buildings containing classrooms and offices, and 1 portable restroom building totaling 6,000SF, and an outdoor play space. These temporary facilities are serving100 middle school students. Phase II consists of the construction of a new 2-story 30,604SF classroom building containing 21 classrooms and offices, 9,272SF gym/administration building including a servery and restrooms, 2 playgrounds and recreational space. This will serve 585 TK-4 students and is currently under construction.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Mayo Hall Renovation and Addition

Mayo Hall Renovation and Addition

Project Details

Location: Vallejo, CA

Square Feet: 20,300

Delivery: Collaborative Design-Build

Categories: Education, Current Projects

The rehabilitation of Mayo Hall calls for the demolition of non-historic additions to make way for a new modern single-story addition. Mayo Hall faces Morrow Cove and the greater San Francisco Bay, which offers incredible opportunities for views out to the Bay and bringing light and air into the new building. The interior layout is organized around a main circulation space dubbed “The Concourse” from which all the different programs for student life and cadet services will be connected. The existing gymnasium will house two large multi-purpose conference rooms and student leadership and career services in an open loft-like second floor. The existing natatorium will remain relatively open and active, housing the student life and bistro spaces. The Health Services department will occupy the Northside addition with its own separate and discrete entrance, providing a truly new health services building. Admissions, registrar and financial aid departments will inhabit the other addition. Mayo Hall emphasizes shared, cultural spaces such as the Wall of Honor, gallery to display Cal Maritime relics, and impromptu spill-out spaces that are critical for meeting and conference room functions. These spaces will not only display the shared history of California Maritime and its alumni, but will also act as a recruitment tool for attracting future cadets to campus. The Mayo Hall Renovation and Addition is one of Otto Construction’s five Collaborative Design-Build projects in the CSU System.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

CRC Elk Grove Center Phase II

CRC Elk Grove Center Rendering

CRC Elk Grove Center Phase II

Project Details

Location: Elk Grove, CA

Square Feet: 25,000

Delivery: Design-Bid-Build

Categories: Education, Current Projects

This project consists of the construction of a new 2-story, 25,000SF academic building at the Cosumnes River College Elk Grove Center.  The building will be constructed using type IIB construction and will house A and B occupancies. Associated landscaping, utilities, and civil work is included in the scope of work. The building is a slab-on-grade, with structural steel, metal framing and curtain wall system, interior has instructional biology, chemistry, and anatomy laboratories as well as much needed support and interaction spaces.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.