Sacramento State Art Sculpture Lab

Sacramento State Art Sculpture Lab

Project Details

Location: Sacramento, CA

Square Feet: 20,377

Delivery: CM-at-Risk

Categories: Education, Current Projects

The new Art Sculpture Lab at Sacramento State replaces a warehouse currently housing the department since the 1960’s. The 20,377SF building will provide appropriate and safe instructional and graduate studio spaces for drawing, painting, sculpture, metal fabrication, and woodworking, including a secure working courtyard and a public sculpture yard.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

American River College Natomas Center Phases II & III

American River College Natomas Center Phases II & III

Project Details

Location: Sacramento, CA

Square Feet: 49,800

Delivery: Design-Bid-Build

Categories: Education, Current Projects

The building program is formed around a central courtyard into which the buildings view and access. This final phase of development complements the original program and includes 5 science labs and associated prep space, 6 classrooms, 4 computer labs, a multi-purpose art lab, faculty offices, administration space and collaboration spaces of different scales both inside and outside the building.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Folsom Lake College Science Building

Folsom Lake College Science Building

Project Details

Location: Folsom, CA

Square Feet: 75,000

Delivery: Design-Bid-Build

Categories: Education, Current Projects

The new 2-story 75,000SF science building is Los Rios Community College District’s single largest value project ever constructed. The instructional building will house six Biology labs, six Chemistry labs, and a 4,000 sq. ft. Science Center, allowing Folsom Lake College (FLC) to significantly expand its science program. Located near the main entrance of FLC, it will establish a dramatic and beautiful presence. Building on the occupied campus will require close coordination to ensure student and staff safety, and to limit disruptions to existing operations.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

ARC Technical Education Building

ARC Technical Education Building

Project Details

Location: Sacramento, CA

Square Feet: 91,000

Delivery: Design-Bid-Build

Categories: Education, Current Projects

This project consists of the construction of a new 2-story, 91,000SF Technical Education Building for the Los Rios Community College District American River College campus. The new building will consist of classrooms, staff offices, conference rooms, gathering spaces, laboratories and maker spaces. Laboratories include an electronics lab, computer lab, soldering lab, mechanical/plumbing lab, and welding yard. There will also be an auto shop and auto yard.

The scope of work requires the demolition of 5 existing building and the associated canopy structures and site work, but the automotive technology building will remain until the new building is complete. This will require our team to provide students an accessible path of travel around the construction site to access the building, which will be just 30 feet from the construction site. Once the new facility has been completed, the auto technology building will be demolished and the automotive yard and welding yard will be built. A new parking lot and associated landscape will take place of the existing automotive technology building.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Sacramento State Faculty & Staff Housing

Sacramento State Faculty & Staff Housing

Project Details

Location: Sacramento, CA

Square Feet: 28,392

Delivery: Collaborative Design-Build

Categories: Education, Housing, Current Projects

Located at the edge of the campus, the building will be situated in an established residential neighborhood and serve as transitional housing for new faculty. The architecture, massing, scale, and materials were designed within the neighborhood context. The three-story, wood-framed housing building will consist of 30 residential units and is organized to save the existing Oak tree and focal point of the courtyard.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Carme Valley Manor Pavilion Renovation

Carme Valley Manor Pavilion Renovation

Project Details

Location: Carmel, CA

Square Feet: 22,974

Delivery: Design-Assist

Categories: Senior Living Complexes, Renovations, Current Projects

Renovation of the 22,974SF Carmel Valley Manor Pavilion including a new bistro, dining room, lounge, reception, and courtyard.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

SMF Terminal A Restroom Renovations

SMF Terminal A Restroom Renovations

Project Details

Location: Sacramento, CA

Square Feet: 9,696

Delivery: CM-at-Risk

Categories: Municipal & Civic, Renovations, Current Projects

This project consists of the renovation of 8 restroom groupings the Sacramento International Airport’s Terminal A. To maintain daily operations and provide enough restrooms open to serve travelers, the work will be performed in 3 phases. The existing restrooms will be demolished and built with new configurations, including fully enclosed toilet rooms for increased privacy.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

Luther Burbank H.S. Pool Replacement

Luther Burbank H.S. Pool Replacement

Project Details

Location: Sacramento, CA

Square Feet: N/A

Delivery: Lease-Leaseback

Categories: Education, Current Projects

This project consisted of the complete removal and replacement of a 6-lane x 25-yard swimming pool, mechanical/chemical systems, and drainage system. The pool deck had to be raised six inches to be level with adjacent walkways, locker rooms, etc.  This increased the amount of usable pool deck area for the addition of bleachers and made the deck ADA compliant. The lockers and showers were replaced in both the girl’s and boy’s locker rooms, and elevations changed to meet current ADA compliance requirements.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

KIPP Conway Homes

KIPP Conway Homes

Project Details

Location: Stockton, CA

Square Feet: 14,335

Delivery: Design-Assist

Categories: Education, Current Projects

 KIPP will operate a public school at Conway Homes – a public housing project located in South Stockton – both to bring a high-quality educational option to Conway Homes families and to help catalyze change for the community.

This project is divided into three phases:

1. Demolition of existing site features, utilities and maintenance buildings.
2. Site work and preparation for the installation of nine 960SF modular classrooms and relocation of two existing modular classrooms.
3. Construction of a new 3,775SF multi-purpose building.

Otto Construction and PBK have been collaborating to finalize the design and provide cost-saving solution. Phase 1 is site work and construction is currently in progress, with phases 2 and 3 still in design.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.

KIPP University Park

KIPP University Park

Project Details

Location: Stockton, CA

Square Feet: 46,000

Delivery: Design-Assist

Categories: Education, Current Projects

KIPP University Park was divided into three phases. Otto recently completed Phase I, which consisted of site utilities, a parking lot and installation of 6 portable buildings containing classrooms and offices, and 1 portable restroom building totaling 6,000SF, and an outdoor play space. These temporary facilities are serving100 middle school students. Phase II consists of the construction of a new 2-story 30,604SF classroom building containing 21 classrooms and offices, 9,272SF gym/administration building including a servery and restrooms, 2 playgrounds and recreational space. This will serve 585 TK-4 students and is currently under construction.

OTTO eNews

Get project updates, latest news, and more.

  • This field is for validation purposes and should be left unchanged.