Mr. Jackson
@mrjackson
Skip to content

SMUD Museum Of Science And Curiosity

SMUD Museum Of Science And Curiosity

Project Details

Location: Sacramento, CA

Square Feet: 48,940

Delivery: Design-Build

Categories: Renovations, Current Projects

The SMUD Museum of Science and Curiosity – formerly known as the Powerhouse Science Center – is an adaptive reuse of the historic 1912-era PG&E Power Station, which sat vacant on the banks of the Sacramento River for 60 years. Before becoming the region’s newest hub for science education and exploration, the historic structure had to undergo stabilization and  rehabilitation. The building received a complete structural retrofit and a second floor for flexible exhibit space. A new two-story, 22,000SF addition was built on the east side of the existing building and contains an entry lobby, classrooms, offices, a café and a 110-seat planetarium prominently on display with a zinc-clad hemispheric dome rising above the building’s mass.

OTTO eNews

Get project updates, latest news, and more.

CSU Stanislaus Vasche Library Renovation

CSU Stanislaus Vasche Library Renovation

Project Details

Location: Turlock, CA

Square Feet: 133,077

Delivery: Collaborative Design-Build

Categories: Education, Renovations, Current Projects

Project Description

This Collaborative Design-Build partnership between Otto Construction, EHDD Architects and CSU Stanislaus will bring the 3-story 1960s era building into the 21st century. Once the renovation is complete, the 133,077SF library will be able to accommodate 1,000 people at a time.  Currently, Stan State’s collection contains 675,000 items that take up 30,603SF of space on multiple floors, but thanks to a new state-of-the-art Electronic Compact Book Storage System the same collection will only take up 16,977SF.  This feature will leave more space in the renovated library for new amenities such as 24-hour study areas, a cafe, group study spaces and quiet zones.

The first phase of the project consisted of the installation of 32 trailers to serve as a temporary home for library services. This made room for the library to be vacated before construction began.

OTTO eNews

Get project updates, latest news, and more.

Hamilton, Ellis & Martin Plaza Renovation

Hamilton, Ellis & Martin Plaza Renovation

Project Details

Location: Seaside, CA

Square Feet: 150,723

Delivery: Negotiated

Categories: Housing, Renovations

Project Description

The project consisted of renovating all apartment units, common buildings, and parking lots. With 192 units, our team used a “rotational process” to avoid displacing any of the residents. This means residents took turns moving to empty units while their apartments were renovated. The renovations included new doors and windows, flooring, light fixtures, appliances, casework, paint, roofing, siding, and balcony enclosures. Amenity improvements included a renovated community center, administration office, laundry facility, a new basketball half-court, outdoor gathering areas and furnishings, and community garden. Accessibility improvements included widening doorways and installing handrails, ramps, signage, and auto-operated doors.

OTTO eNews

Get project updates, latest news, and more.

Turlock Irrigation District Palm Street Office Complex Renovation

Turlock Irrigation District Palm Street Office Complex Renovation

Project Details

Location: Turlock, CA

Square Feet: 37,018

Delivery: CM-at-Risk

Categories: Renovations, Corporate Complexes

Project Description

This project consisted of the renovation of two existing buildings that were previously occupied by the City of Turlock into a new Power Operations Building and Water Distribution Building for the Turlock Irrigation District. The two buildings required significant renovations, including replacing and raising the roof structure to provide clear span spaces and additional height on the inside for the Power Control Center’s video display wall. The new open office environment is surrounded by support spaces such as focus rooms, a new Irrigation Control room, fitness center, break and locker rooms, and new conference rooms. Both buildings were designed to optimize energy efficiency, conserve resources, and reduce long-term maintenance costs for the District.

OTTO eNews

Get project updates, latest news, and more.

Rancho San Justo Middle School Modernization

Rancho San Justo Middle School Modernization

Project Details

Location: Hollister, CA

Square Feet: 3,760

Delivery: Lease-Leaseback

Categories: Education, Renovations

Project Description

Installation of a 2,800SF administration portable and two 480SF restroom portables. The scope also includes associated utilities and site work.

OTTO eNews

Get project updates, latest news, and more.